SE2: TH Rube Goldberg
My Systems Engineering Senior Project
Wednesday, March 23, 2011
Working Video
Testing
The following sheet was used in order to evaluate and assess the testing of each or all of the systems.
The following are pictures of testing as well as the individual systems which were being tested. Also are some videos of the testing being done.
#1. Pachinko
#2. Marble Track
#3. Race Car Track
#5. Marble Maze
#6. Funnel System
#7. Final Marble Track
#8. Drop Down Marble Track
#9. Final Picture
![]() |
| Testing Form |
The following are pictures of testing as well as the individual systems which were being tested. Also are some videos of the testing being done.
#1. Pachinko
| Pachinko Machine |
#2. Marble Track
![]() |
| Initial Marble Track Design |
| Updated Marble Track Design |
Testing Video of Marble Track
#3. Race Car Track
| Restraining Mechanism for Race Car Tracl |
Testing Video of Marble Track and Race Car Track
#4. Domino Track
| Initial Domino Track Restraint System |
| Final Domino Restraint System |
#5. Marble Maze
| Marble Maze |
#6. Funnel System
| Creating the Funnel System |
| Funnel and Tube Assembly |
#7. Final Marble Track
| Marble track leading to tube |
| Marble Tube leading to PVC pipe track |
#8. Drop Down Marble Track
| Marble Dropdown Track |
| Attachment System for Marble Track with Final Trigger |
#9. Final Picture
| Final System |
Labels:
Testing
Monday, March 21, 2011
Building the whole thing
These are pictures of the contruction of the mechanical parts of the project, conducted at my house. It took over 25 hours to assemble and test all the pieces.
| Creating the cross sections of nails |
| working on the marble track |
| installing the nail-pvc pipe |
| installing the nail-pvc pipe |
| trigger mechanism for the racecar track |
| trigger system for the racetrack |
| cutting the wood for the domino track |
| constructing the domino track |
| constructing the domino track |
| cleaning up |
| constructing the domino track |
| using a rig to drill all dominos the same |
| close up of domino rig |
| drilling holes in domino track for the dominos |
| nailing each domino into the domino track |
| gluing the funnel together |
| marble maze |
| installing the first method to hold dominos in the upright position |
| constructing second method to hold dominos in the upright position |
| finished domino track |
| funnel assembly |
| installed domino track |
| creating the clear front for the pachinko |
| the installed pachinko |
| view of the pachinko, racecar track, and marble track |
| view of the domino track in conjunction with the maze |
| first try at the funnel-marble track assembly |
| second view of above |
| layered marble track |
| trigger system for the mercury switch |
| extra maze that is made up to make up the space for the lost distance from the 1/4 less turn in the funnel assembly |
| same as above |
| the finished inner workings |
Labels:
Building
Monday, March 14, 2011
Looking forward another week, plus pictures!
This week I plan to not only have the entire box done with its painting design, but also the addition of three new systems into the box. The marbel track is complete, the racecar track must be installed, and the airplane track must be added in as well. This will be complete, or very close to completion by Friday. The picture you see below are of the coloring scheme for the box in proccess, as well as the color scheme for the marbel track.