| Creating the cross sections of nails |
| working on the marble track |
| installing the nail-pvc pipe |
| installing the nail-pvc pipe |
| trigger mechanism for the racecar track |
| trigger system for the racetrack |
| cutting the wood for the domino track |
| constructing the domino track |
| constructing the domino track |
| cleaning up |
| constructing the domino track |
| using a rig to drill all dominos the same |
| close up of domino rig |
| drilling holes in domino track for the dominos |
| nailing each domino into the domino track |
| gluing the funnel together |
| marble maze |
| installing the first method to hold dominos in the upright position |
| constructing second method to hold dominos in the upright position |
| finished domino track |
| funnel assembly |
| installed domino track |
| creating the clear front for the pachinko |
| the installed pachinko |
| view of the pachinko, racecar track, and marble track |
| view of the domino track in conjunction with the maze |
| first try at the funnel-marble track assembly |
| second view of above |
| layered marble track |
| trigger system for the mercury switch |
| extra maze that is made up to make up the space for the lost distance from the 1/4 less turn in the funnel assembly |
| same as above |
| the finished inner workings |
No comments:
Post a Comment