These are pictures of the contruction of the mechanical parts of the project, conducted at my house. It took over 25 hours to assemble and test all the pieces.
Creating the cross sections of nails
working on the marble track
installing the nail-pvc pipe
installing the nail-pvc pipe
trigger mechanism for the racecar track
trigger system for the racetrack
cutting the wood for the domino track
constructing the domino track
constructing the domino track
cleaning up
constructing the domino track
using a rig to drill all dominos the same
close up of domino rig
drilling holes in domino track for the dominos
nailing each domino into the domino track
gluing the funnel together
marble maze
installing the first method to hold dominos in the upright position
constructing second method to hold dominos in the upright position
finished domino track
funnel assembly
installed domino track
creating the clear front for the pachinko
the installed pachinko
view of the pachinko, racecar track, and marble track
view of the domino track in conjunction with the maze
first try at the funnel-marble track assembly
second view of above
layered marble track
trigger system for the mercury switch
extra maze that is made up to make up the space for the lost distance from the 1/4 less turn in the funnel assembly
same as above
the finished inner workings